Mineral Mining Technology

标题 文件
卷 52, 编号 5 (2016) Rockbolting improvement in Coal Mines in permafrost regions PDF
(Eng)
Razumov E., Klishin V., Opruk G., Grechishkin P.
卷 52, 编号 5 (2016) Optimal extraction sequence modeling for open pit mining operation considering the dynamic cutoff grade PDF
(Eng)
Moosavi E., Gholamnejad J.
卷 52, 编号 4 (2016) Single-phase local optimization model for limestone supply from open pit mines to heat power plants in Serbia PDF
(Eng)
Radosavljević M., Vujić S., Boshevski T., Prashtalo J., Jovanović B.
卷 52, 编号 4 (2016) Method and estimation of efficient differentiation of coal reserves based on washability PDF
(Eng)
Freidina E., Botvinnik A., Dvornikova A.
卷 52, 编号 4 (2016) Stripping with direct dumping in Kuzbass open pit mines: The current state and prospects PDF
(Eng)
Cheskidov V., Norri V.
卷 52, 编号 4 (2016) Optimal mill cut-off grade modeling in the mineral deposits via MIP: Haftcheshmeh copper deposit PDF
(Eng)
Gholinejad M., Moosavi E.
卷 52, 编号 3 (2016) Coalbed methane release as a function of coal breakup PDF
(Eng)
Ordin A., Timoshenko A.
卷 52, 编号 3 (2016) Experimental studies into technology of generation of pay zones in gold mine waste PDF
(Eng)
Alekseev V., Seryi R.
卷 52, 编号 2 (2016) Appraisal and development of gold-containing mine waste in the Amur River Area PDF
(Eng)
Litvintsev V., Sery R., Banshchikova T., Sas P.
卷 52, 编号 2 (2016) Evaluation of technological parameters for apatite extraction by surface miners PDF
(Eng)
Ordin A., Schwabenland E.
卷 52, 编号 2 (2016) The physical and numerical modeling of sand production and gravel pack in oil wells by designing and manufacturing the machine and presenting a relation estimating sand production rate PDF
(Eng)
Shirinabadi R., Moarefvaand P., Goshtasbi K., Ahangari K.
卷 52, 编号 1 (2016) Predictive analysis of slope stability of internal dumps in Tamnava–West field mine after flooding PDF
(Eng)
Petrović B., Vujić S., Čebašek V., Gajić G., Ignjatović D.
卷 52, 编号 1 (2016) Prospects for underground leaching in gold mines PDF
(Eng)
Sekisov A., Shevchenko Y., Lavrov A.
卷 52, 编号 1 (2016) Improvement of bottom structure of a production block in ore drawing using load–haul–dumpers PDF
(Eng)
Sokolov I., Smirnov A., Antipin Y., Baranovskii K.
卷 52, 编号 1 (2016) Efficiency of cyclical-and-continuous method in open pit mining PDF
(Eng)
Yakovlev V., Karmaev G., Bersenev V., Glebov A., Semenkin A., Sumina I.
76 - 90 的 90 信息 << < 1 2 3 4