| 期 |
标题 |
文件 |
| 卷 52, 编号 5 (2016) |
Rockbolting improvement in Coal Mines in permafrost regions |
 (Eng)
|
|
Razumov E., Klishin V., Opruk G., Grechishkin P.
|
| 卷 52, 编号 5 (2016) |
Optimal extraction sequence modeling for open pit mining operation considering the dynamic cutoff grade |
 (Eng)
|
|
Moosavi E., Gholamnejad J.
|
| 卷 52, 编号 4 (2016) |
Single-phase local optimization model for limestone supply from open pit mines to heat power plants in Serbia |
 (Eng)
|
|
Radosavljević M., Vujić S., Boshevski T., Prashtalo J., Jovanović B.
|
| 卷 52, 编号 4 (2016) |
Method and estimation of efficient differentiation of coal reserves based on washability |
 (Eng)
|
|
Freidina E., Botvinnik A., Dvornikova A.
|
| 卷 52, 编号 4 (2016) |
Stripping with direct dumping in Kuzbass open pit mines: The current state and prospects |
 (Eng)
|
|
Cheskidov V., Norri V.
|
| 卷 52, 编号 4 (2016) |
Optimal mill cut-off grade modeling in the mineral deposits via MIP: Haftcheshmeh copper deposit |
 (Eng)
|
|
Gholinejad M., Moosavi E.
|
| 卷 52, 编号 3 (2016) |
Coalbed methane release as a function of coal breakup |
 (Eng)
|
|
Ordin A., Timoshenko A.
|
| 卷 52, 编号 3 (2016) |
Experimental studies into technology of generation of pay zones in gold mine waste |
 (Eng)
|
|
Alekseev V., Seryi R.
|
| 卷 52, 编号 2 (2016) |
Appraisal and development of gold-containing mine waste in the Amur River Area |
 (Eng)
|
|
Litvintsev V., Sery R., Banshchikova T., Sas P.
|
| 卷 52, 编号 2 (2016) |
Evaluation of technological parameters for apatite extraction by surface miners |
 (Eng)
|
|
Ordin A., Schwabenland E.
|
| 卷 52, 编号 2 (2016) |
The physical and numerical modeling of sand production and gravel pack in oil wells by designing and manufacturing the machine and presenting a relation estimating sand production rate |
 (Eng)
|
|
Shirinabadi R., Moarefvaand P., Goshtasbi K., Ahangari K.
|
| 卷 52, 编号 1 (2016) |
Predictive analysis of slope stability of internal dumps in Tamnava–West field mine after flooding |
 (Eng)
|
|
Petrović B., Vujić S., Čebašek V., Gajić G., Ignjatović D.
|
| 卷 52, 编号 1 (2016) |
Prospects for underground leaching in gold mines |
 (Eng)
|
|
Sekisov A., Shevchenko Y., Lavrov A.
|
| 卷 52, 编号 1 (2016) |
Improvement of bottom structure of a production block in ore drawing using load–haul–dumpers |
 (Eng)
|
|
Sokolov I., Smirnov A., Antipin Y., Baranovskii K.
|
| 卷 52, 编号 1 (2016) |
Efficiency of cyclical-and-continuous method in open pit mining |
 (Eng)
|
|
Yakovlev V., Karmaev G., Bersenev V., Glebov A., Semenkin A., Sumina I.
|
| 76 - 90 的 90 信息 |
<< < 1 2 3 4
|