Improving coke-plant efficiency by dry quenching with natural gas
- 作者: Sultanguzin I.A.1, Bologova V.V.1, Gyulmaliev A.M.2, Glazov V.S.1, Belov R.B.1
-
隶属关系:
- Moscow Energy Institute
- Topchiev Institute of Petrochemical Synthesis
- 期: 卷 59, 编号 2 (2016)
- 页面: 61-67
- 栏目: Equipment and Power Systems
- URL: https://journal-vniispk.ru/1068-364X/article/view/225879
- DOI: https://doi.org/10.3103/S1068364X16020046
- ID: 225879
如何引用文章
详细
The energy efficiency of a coke plant may be increased if natural gas is used in dry quenching of the coke. The heat from the decomposition products of the natural gas is employed to boost steam generation in the waste-heat boiler. In addition, the solid carbon produced in decomposition increases the coke strength. The material and thermal balance of the dry-quenching system is calculated. A TQ diagram of the heat-transfer process in the waste-heat boiler is plotted. If dry quenching with natural gas were used for all the coke produced at a full-cycle steel plant, it would be possible to use turbines of unit power 40–65 MW. The economic benefit may be assessed in terms of the decrease in coke consumption in the blast furnace and the increased power generation thanks to utilization of the coke’s waste heat, with corresponding reduction in fuel purchases.
作者简介
I. Sultanguzin
Moscow Energy Institute
编辑信件的主要联系方式.
Email: SultanguzinIA@mpei.ru
俄罗斯联邦, ul. Krasnokazarmennaya 14, Moscow, 111250
V. Bologova
Moscow Energy Institute
Email: SultanguzinIA@mpei.ru
俄罗斯联邦, ul. Krasnokazarmennaya 14, Moscow, 111250
A. Gyulmaliev
Topchiev Institute of Petrochemical Synthesis
Email: SultanguzinIA@mpei.ru
俄罗斯联邦, pr. Leninskii 29, Moscow, 119991
V. Glazov
Moscow Energy Institute
Email: SultanguzinIA@mpei.ru
俄罗斯联邦, ul. Krasnokazarmennaya 14, Moscow, 111250
R. Belov
Moscow Energy Institute
Email: SultanguzinIA@mpei.ru
俄罗斯联邦, ul. Krasnokazarmennaya 14, Moscow, 111250
补充文件
