Estimate for interstage water injection in air compressor incorporated into gas-turbine cycles and combined power plants cycles


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

The objects of study are the gas turbine (GT) plant and combined cycle power plant (CCPP) with opportunity for injection between the stages of air compressor. The objective of this paper is technical and economy optimization calculations for these classes of plants with water interstage injection. The integrated development environment “System of machine building program” was a tool for creating the mathematic models for these classes of power plants. Optimization calculations with the criterion of minimum for specific capital investment as a function of the unit efficiency have been carried out. For a gas-turbine plant, the economic gain from water injection exists for entire range of power efficiency. For the combined cycle plant, the economic benefit was observed only for a certain range of plant’s power efficiency.

作者简介

A. Kler

Melentiev Energy Systems Institute SB RAS

Email: contain@mail.ru
俄罗斯联邦, Irkutsk

Yu. Zakharov

Melentiev Energy Systems Institute SB RAS

编辑信件的主要联系方式.
Email: contain@mail.ru
俄罗斯联邦, Irkutsk

Yu. Potanina

Melentiev Energy Systems Institute SB RAS

Email: contain@mail.ru
俄罗斯联邦, Irkutsk

补充文件

附件文件
动作
1. JATS XML

版权所有 © Pleiades Publishing, Ltd., 2017