Soil Loosening of the Contact Zone Under the First Column of Tall Concrete Dams
- 作者: Durcheva V.N.1, Puchkova S.M.1
-
隶属关系:
- B. E. Vedeneev All-Russian Research Institute of Hydraulic Engineering
- 期: 卷 50, 编号 4 (2016)
- 页面: 365-368
- 栏目: Article
- URL: https://journal-vniispk.ru/1570-145X/article/view/245281
- DOI: https://doi.org/10.1007/s10749-016-0714-7
- ID: 245281
如何引用文章
详细
The cause of tensile stresses in the contact zone under the first column, as well as the effect of dam static behavior on the seasonal variation of seepage regime parameters in the bed are found based on long-term structural observations on the state of tall gravity dams during their construction and operation. An approach of drain holes to the upstream face is shown to be an effective measure of reducing the backpressure at the foot of the dam.
作者简介
V. Durcheva
B. E. Vedeneev All-Russian Research Institute of Hydraulic Engineering
编辑信件的主要联系方式.
Email: DurchevaVN@vniig.ru
俄罗斯联邦, St. Petersburg
S. Puchkova
B. E. Vedeneev All-Russian Research Institute of Hydraulic Engineering
Email: DurchevaVN@vniig.ru
俄罗斯联邦, St. Petersburg
补充文件
