OPTIMAL CONTROL OF THE LIFE CYCLE OF COMPLEX SYSTEMS
- Autores: Belov M.V1
-
Afiliações:
- Skolkovo Institute of Science and Technology
- Edição: Nº 1 (2022)
- Páginas: 19-32
- Seção: Control in Social and Economic Systems
- URL: https://journal-vniispk.ru/1819-3161/article/view/350821
- DOI: https://doi.org/10.25728/pu.2022.1.2
- ID: 350821
Citar
Texto integral
Resumo
Sobre autores
M. Belov
Skolkovo Institute of Science and Technology
Email: mbelov59@mail.ru
Moscow, Russia
Bibliografia
- The Guide to the Systems Engineering Body of Knowledge (SEBoK) v. 1.2 / Ed. by Pyster A., Olwell A. (eds). - Hoboken: The Trustees of the Stevens Institute of Technology, 2013. - http://www.sebokwiki.org просмотрен 29-08-2021.
- ISO/IEC/IEEE 15288:2015. Systems and Software Engineering - System Life Cycle Processes.
- Новиков, Д.А. Кибернетика: Навигатор. История кибернетики, современное состояние, перспективы развития - М.: Ленанд, 2016. - 160 с.
- Перегудов, Ф.И. Тарасенко Ф.П. Введение в системный анализ - М.: Высшая школа, 1989. - 320 с.
- ГОСТ Р 54871-2011. Проектный менеджмент. Требования к управлению программой.
- ГОСТ Р 56136-2014. Управление жизненным циклом продукции военного назначения. Термины и определения.
- Месарович М., Мако Д., Такахара И. Теория иерархических многоуровневых систем. - М.: Мир, 1973. - 344 с.
- Моисеев Н.Н. Математические задачи системного анализа. - М.: Наука, 1981. - 488 с.
- Rebovich, G. Enterprise Systems Engineering: Advances in the Theory and Practice / Rebovich, G., White, B. (Eds). - Boca Raton: CRC Press. 2011. - 459 p.
- Farr, J.V. Systems Life Cycle Costing: Economic Analysis, Estimation, and Management (Engineering Management). 1st Edition. - CRC Press, 2011. - 316 p.
- Gupta, Y., Chow, W.S. Twenty-Five Years of Life Cycle Costing Theory and Application: A Survey / The Intern. Journal of Quality and Reliability Management. - 1985. - Vol. 2. - P. 51-76.
- Leszczynski, Z., Jasinski, T.Comparison of Product Life Cycle Cost Estimating Models Based on Neural Networks and Parametric Techniques-A Case Study for Induction Motors. - Sustainability. - 2020. - Vol. 12, art. no. 8353. - P. 2 - 14. - doi: 10.3390/su12208353.
- Liu, H., Gopalkrishnan, V., Ng, W.K., et al. An Intelligent System for Estimating Full Product Life Cycle Cost at the Early Design Stage // Intern. Journal of Product Lifecycle Management. - 2008. - No. 2(2-3). - P. 96-113.
- Loyer, J.L. A MBSE Probabilistic Framework for Preliminary Lifecycle Costing of Mechanical Products /j.L. Loyer, E. Henriques // INCOSE International Symposium. - Las Vegas, NV, 2014. - Vol. 24, iss. 1. - P. 182-195.
- Oduyemi, O., Okoroh, M. and Dean, A. Developing an artificial neural network model for life cycle costing in buildings. In: Raidén, A.B. and Aboagye-Nimo, E. (Eds). - Procs 31st Annual ARCOM Conference. - Lincoln, UK, 2015. - P. 843-852.
- Wang, G., Roedler, G.J., Pena, M., Valerdi, R.A. A Generalized Systems Engineering Reuse Framework and its Cost Estimating Relationship // INCOSE International Symposium. - Las Vegas, NV, 2014. - Vol. 24, iss. 1. - P. 274-297.
- Captain, T. Can we afford our own future? Why R&D programs are late and over-budget - and what can be done to fix the problem. - Deloitte Development LLC, 2009. - 28 p.
- NASA Cost Estimating Handbook. Version 4.0. - NASA Headquarters. Cost Analysis Division. - Washington, DC (US): National Aeronautics and Space Administration, 2015.
- GAO Cost Estimating and Assessment Guide. Best Practices for Developing and Managing Capital Program Costs. GAO-09-3SP. - United States Government Accountability Office. - Washington, D.C., 2009. - 440 p.
- Holland, J. Studying Complex Adaptive Systems // Journal of Systems Science and Complexity. - 2006. - Vol. 19(1). - P. 1-8.
- North, M. A Theoretical Formalism for Analyzing Agent-based Models // Complex Adaptive Systems Modeling, 2014. - Vol. 2, art. no. 3. - doi: 10.1186/2194-3206-2-3. - http://link.springer.com/article/10.1186/2194-3206-2-3.
- Rzevski, G., Skobelev, P. Managing Complexity. - London: WIT Press, 2014. - 216 p.
- Sanchez-Anguix, V., Tunalı, O., Aydoğan, R., Julian, V. Can Social Agents Efficiently Perform in Automated Negotiation? - Applied Sciences. - 2021. - Vol. 11, art. no. 6022. - https://doi.org/10.3390/app11136022.
- Alagar, V.S., Periyasamy, K. Calculus of Communicating Systems. In: Specification of Software Systems. in Computer Science. London: Springer, 2011. - https://doi.org/10.1007/978-0-85729-277-3_15.
- Bergstra, J. Process Algebra for Synchronous Communicaition / Information and Control. - 1984. - Vol. 60. - P. 109-137.
- Hoare, C.Communicating Sequential Processes. - New York: Prentice Hall, 1985. - 256 p.
- Milner, R. A Calculus of Communicating Systems. - Lecture Notes in Computer Science. - Heidelberg: Springer Verlag, 1980. - Vol. 92. - 171 p.
- Estefan, J. Survey of MBSE Methodologies. - Seattle, Wa: INCOSE, 2008. - 70 p. - http://www.omgsysml.org/ mbse_methodology_survey_revb.pdf.
- The Oxford Handbook of the Economics of Networks. - Oxford: Oxford University Press, 2016. - 856 p.
- Jackson, M. Social and Economic Networks - Princeton: Princeton University Press, 2010. - 520 p.
- Бурков, В.Н., Горгидзе И.А., Ловецкий. С.Е. Прикладные задачи теории графов. - Тбилиси: ВЦ АН ГССР, 1974. - 232 с.
- Голенко-Гинзбург, Д.И. Стохастические сетевые модели планирования и управления разработками - Воронеж: Научная книга, 2010. - 284 с.
- Матвеев, А.А., Новиков Д.А., Цветков А.В. Модели и методы управления портфелями проектов - М.: ИПУ РАН, 2005. - 206 с.
- Kelly, F., Yudovina, E. Stochastic Networks. - Cambridge: Cambridge University Press, 2014. - 230 p.
- Клейнер Г.Б. Эволюция и модернизация теории предприятия // Экономическая трансформация и экономическая теория. 5-й Междунар. симпозиум по эволюционной экономике. - М.: ИЭ РАН., 2004. - 27 с.
- Вожаков А.В., Гитман М.Б., Столбов В.Ю. Модели принятия коллективных решений в производственных системах // Управление большими системами. - 2015. - Вып. 58. - С. 161-178.
- Минцберг, Г. Структура в кулаке: создание эффективной организации. Пер. с англ. под ред. Ю. Н. Каптуревского. - СПб.: Питер, 2004. - 512 c.
- Adizes, I. Managing Corporate Lifecycles: An updated and expanded look at the Corporate Lifecycles. - The Adizes Institute Publishing, 2004. - 460 p.
- A Guide to the Project Management Body of Knowledge (PMBOK® Guide). 6th edition. - Project Management Institute, 2017. - 579 p.
- Белов М.В., Новиков Д.А. Модели деятельности. - М.: Ленанд, 2021. - 220 с.
- Белов М.В., Новиков Д.А. Методология комплексной деятельности. - М.: Ленанд, 2018. - 320 с.
- ISO/IEC/IEEE 24748-1:2018. Systems and software engineering - Life cycle management - Part 1: Guidelines for life cycle management.
- Гермейер, Ю.Б. Игры с непротивоположными интересами. - М.: Наука, 1976. - 327 с.
- Бурков, В.Н. Основы математической теории активных систем. - М.: Наука, 1977. - 255 с.
- Новиков Д.А. Теория управления организационными системами: 3-е изд. - М.: Физматлит, 2012. - 604 с.
- Bolton, P., Dewatripont, M. Contract Theory. - Cambridge: MIT Press, 2005. - 740 p.
- Белов М.В. Согласованное управление многоэлементными динамическими организационными системами. Ч. 1. Динамическая организационная система в составе одного центра и множества агентов // Проблемы управления. - 2020. - № 1. - С. 39-47. [Belov, M.V. Incentive-Compatible Control in Dynamic Multi-Agent Systems. Part 1. Contracts In Dynamic System With One Principal And Multiple Agents. - Control Sciences. - 2020. - No. 1. - P. 39-47. (In Russian)]
- Белов М.В. Согласованное управление многоэлементными динамическими организационными системами. Ч. 2. Многоуровневая динамическая организационная система // Проблемы управления. - 2020. - № 2. - С. 36-46. [Belov, M.V. Incentive-Compatible Control in Dynamic Multi-Agent Systems. Part 2. Contracts in Dynamic Hierarchical Multi-Agent System. - Control Sciences. - 2020. - No. 2. - P. 36-46. (In Russian)]
- Belov, M., Novikov, D. Optimal Enterprise. Structures, Processes and Mathematics of Knowledge, Technology and Human Capital. - CRC Press, 2021. - 344 p.
- Белов М.В., Новиков Д.А. Управление жизненными циклами организационно-технических систем. - М.: Ленанд, 2020. - 384 с.
- Dewar, J. Assumption Based Planning a Tool for Reducing Avoidable Surprises. - Cambridge: Cambridge University Press, 2002. - 248 p.
Arquivos suplementares



