Modeling of the Initial Parameters in the Adjustment of an Oil Recovery Process Control System. Part 2. Determination of Limits on the Vectors of the State Variables and Disturbances*


Citar

Texto integral

Acesso aberto Acesso aberto
Acesso é fechado Acesso está concedido
Acesso é fechado Somente assinantes

Resumo

Constraints on the degree of specification and the statement of models of limits on the vectors of state variables of an oil recovery and intrastratal disturbance process control system are given. The structures of the models are found through a solution of the dual problems of the classical theories of filtration and underground hydrodynamics. The limits on the constraints placed on the vectors of the input and output variables of the control systems are the result of an improvement in the dynamic models of the determination of drill hole dip and direction of existing wells.

Sobre autores

S. Batalov

Ufa State Academy of Economics and Service

Autor responsável pela correspondência
Email: geoavtsyst@mail.ru
Rússia, Ufa

Arquivos suplementares

Arquivos suplementares
Ação
1. JATS XML

Declaração de direitos autorais © Springer Science+Business Media New York, 2016