Inflow Performance Relationship (IPR) Equation for a Damaged Well in Solution-Gas Drive Production
- Авторлар: Ren Z.1, Wu X.1, Li H.1
-
Мекемелер:
- MOE Key Laboratory of Petroleum Engineering in China University of Petroleum
- Шығарылым: Том 52, № 6 (2017)
- Беттер: 736-743
- Бөлім: Article
- URL: https://journal-vniispk.ru/0009-3092/article/view/234789
- DOI: https://doi.org/10.1007/s10553-017-0767-9
- ID: 234789
Дәйексөз келтіру
Аннотация
We have analyzed Standing’s equation for a damaged well and have identified its problems, and have taken them into account to develop a new inflow equation to predict productivity for a damaged well in solution-gas drive production. For comparison, we used both equations to calculate the inflow performance relationship (IPR) curves and have established that the calculation results are quite different. We have demonstrated the validity of the new equation. We have derived a formula for calculating the flow efficiency of the well.
Авторлар туралы
Zongxiao Ren
MOE Key Laboratory of Petroleum Engineering in China University of Petroleum
Хат алмасуға жауапты Автор.
Email: 765802228@qq.com
ҚХР, Beijing, 102249
Xiaodong Wu
MOE Key Laboratory of Petroleum Engineering in China University of Petroleum
Email: 765802228@qq.com
ҚХР, Beijing, 102249
Hui Li
MOE Key Laboratory of Petroleum Engineering in China University of Petroleum
Email: 765802228@qq.com
ҚХР, Beijing, 102249
Қосымша файлдар
