Engineering Method of Calculating the Settlement of Two-Bladed Screw Pile in Clayey Soil
- Autores: Polishchuk A.I.1, Maksimov F.A.1
-
Afiliações:
- Trubilin Kuban State Agrarian University (KubGAU)
- Edição: Volume 54, Nº 6 (2018)
- Páginas: 377-383
- Seção: Design
- URL: https://journal-vniispk.ru/0038-0741/article/view/244133
- DOI: https://doi.org/10.1007/s11204-018-9484-6
- ID: 244133
Citar
Resumo
A method is developed for calculating the settlement of single double-bladed metallic screw piles in clayey soils for the foundations of temporary buildings. The method is based on the use of a patented design of a screw double-bladed pile and takes account of the nonlinear load dependence of its settlement. It is established that for clayey soils with semi-solid consistency the discrepancy obtained between the experimental final settlements of double-bladed screw piles and the computational data obtained by the proposed method does not exceed 20-30%.
Sobre autores
A. Polishchuk
Trubilin Kuban State Agrarian University (KubGAU)
Email: smfe@mail.ru
Rússia, Krasnodar
F. Maksimov
Trubilin Kuban State Agrarian University (KubGAU)
Email: smfe@mail.ru
Rússia, Krasnodar
Arquivos suplementares
