Experimental Study of Laterally Loaded Stub Abutment and Unburied Piles


Дәйексөз келтіру

Толық мәтін

Ашық рұқсат Ашық рұқсат
Рұқсат жабық Рұқсат берілді
Рұқсат жабық Тек жазылушылар үшін

Аннотация

In the integral bridge, the deck contraction makes the abutment move away from backfill and causes a failure wedge. To inhibit the failure wedge, a new method with connector from each abutment to the unburied piles outside the bridge has been proposed. The soil behavior around laterally loaded stub abutment and unburied piles was studied on laboratory models using the PIV (particle image velocimetry) method. The effects of unburied pile number and soil − pile interaction on the soil deformation pattern were investigated.

Авторлар туралы

S. Khatibi

Department of Civil Engineering, University of Tabriz

Хат алмасуға жауапты Автор.
Email: saeedkhakikhatibi@yahoo.com
Иран, Tabriz

M. Barghian

Department of Civil Engineering, University of Tabriz

Email: saeedkhakikhatibi@yahoo.com
Иран, Tabriz

M. Hajialilue-Bonab

Department of Civil Engineering, University of Tabriz

Email: saeedkhakikhatibi@yahoo.com
Иран, Tabriz

Қосымша файлдар

Қосымша файлдар
Әрекет
1. JATS XML

© Springer Science+Business Media, LLC, part of Springer Nature, 2019