Rehabilitation of Building 53 at VNIINM


Дәйексөз келтіру

Толық мәтін

Ашық рұқсат Ашық рұқсат
Рұқсат жабық Рұқсат берілді
Рұқсат жабық Тек жазылушылар үшін

Аннотация

A complex of decontamination and dismantling work on removing radiation contaminated equipment and special utility lines in the previously mothballed building 53 at VNIINM has been implemented. The 33.1 m long air pathway between building 53 and building B, contaminated by α-emitters to 120 particles/(cm2·min), has been dismantled. Thirty-three pieces of large-size equipment were dismantled. Fifteen pieces of equipment were decontaminated. Special utility lines of the building were completely dismantled: ~140 m special drain lines and ~320 m special ventilation. Approximately 180 m of piping has been decontaminated. Low-waste decontamination procedures made it possible to reduce the amount of radwaste produced during rehabilitation work by more than 1.5 times (to 27 m3). A radiation survey established that the procedure has unlimited application in the enterprise’s business activities taking into consideration the location on the industrial site at VNIINM.

Авторлар туралы

A. Kuznetsov

Bochvar High-Technology Research Institute of Inorganic Materials (VNIINM)

Хат алмасуға жауапты Автор.
Email: aykuznetsov@bochvar.ru
Ресей, Moscow

E. Antsiferova

Bochvar High-Technology Research Institute of Inorganic Materials (VNIINM)

Email: aykuznetsov@bochvar.ru
Ресей, Moscow

S. Belousov

Bochvar High-Technology Research Institute of Inorganic Materials (VNIINM)

Email: aykuznetsov@bochvar.ru
Ресей, Moscow

I. Vereshchagin

Bochvar High-Technology Research Institute of Inorganic Materials (VNIINM)

Email: aykuznetsov@bochvar.ru
Ресей, Moscow

S. Khlebnikov

Bochvar High-Technology Research Institute of Inorganic Materials (VNIINM)

Email: aykuznetsov@bochvar.ru
Ресей, Moscow

Қосымша файлдар

Қосымша файлдар
Әрекет
1. JATS XML

© Springer Science+Business Media, LLC, part of Springer Nature, 2019