Rehabilitation of Building 53 at VNIINM


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

A complex of decontamination and dismantling work on removing radiation contaminated equipment and special utility lines in the previously mothballed building 53 at VNIINM has been implemented. The 33.1 m long air pathway between building 53 and building B, contaminated by α-emitters to 120 particles/(cm2·min), has been dismantled. Thirty-three pieces of large-size equipment were dismantled. Fifteen pieces of equipment were decontaminated. Special utility lines of the building were completely dismantled: ~140 m special drain lines and ~320 m special ventilation. Approximately 180 m of piping has been decontaminated. Low-waste decontamination procedures made it possible to reduce the amount of radwaste produced during rehabilitation work by more than 1.5 times (to 27 m3). A radiation survey established that the procedure has unlimited application in the enterprise’s business activities taking into consideration the location on the industrial site at VNIINM.

作者简介

A. Kuznetsov

Bochvar High-Technology Research Institute of Inorganic Materials (VNIINM)

编辑信件的主要联系方式.
Email: aykuznetsov@bochvar.ru
俄罗斯联邦, Moscow

E. Antsiferova

Bochvar High-Technology Research Institute of Inorganic Materials (VNIINM)

Email: aykuznetsov@bochvar.ru
俄罗斯联邦, Moscow

S. Belousov

Bochvar High-Technology Research Institute of Inorganic Materials (VNIINM)

Email: aykuznetsov@bochvar.ru
俄罗斯联邦, Moscow

I. Vereshchagin

Bochvar High-Technology Research Institute of Inorganic Materials (VNIINM)

Email: aykuznetsov@bochvar.ru
俄罗斯联邦, Moscow

S. Khlebnikov

Bochvar High-Technology Research Institute of Inorganic Materials (VNIINM)

Email: aykuznetsov@bochvar.ru
俄罗斯联邦, Moscow

补充文件

附件文件
动作
1. JATS XML

版权所有 © Springer Science+Business Media, LLC, part of Springer Nature, 2019