Treatment of coke-plant wastewater at Bhilai Steel Plant
- 作者: Sabirova T.M.1, Ryazantseva N.A.2
-
隶属关系:
- Yeltsin Ural Federal University
- AO VUKhIN
- 期: 卷 60, 编号 8 (2017)
- 页面: 326-331
- 栏目: Industrial Safety
- URL: https://journal-vniispk.ru/1068-364X/article/view/226322
- DOI: https://doi.org/10.3103/S1068364X17080051
- ID: 226322
如何引用文章
详细
The existing biochemical system in the coke plant at Bhilai Steel Plant is inspected and assessed, with a view to introducing nitrification and denitrification, without reconstruction. It is shown that the existing biochemical-treatment facility will accommodate a nitrification and denitrification system capable of processing coke at a rate of 3.0–3.5 million t/yr. With reconstruction of the aeration system, the throughput may be increased to 4.8 million t/yr. That entails continuous dosing of alkaline reagent in the treated water. Recommendations are made for improved operation of the biochemical system.
作者简介
T. Sabirova
Yeltsin Ural Federal University
编辑信件的主要联系方式.
Email: sabirovatm@gmail.com
俄罗斯联邦, Yekaterinburg
N. Ryazantseva
AO VUKhIN
Email: sabirovatm@gmail.com
俄罗斯联邦, Yekaterinburg
补充文件
