Improving the Investment Potential of the Evenkiiskaya HPP When Working Jointly with HPPS of the Volga – Kama Cascade
- 作者: Aleksandrovskii A.Y.1, Soldatkin A.Y.1, Volkov D.M.1
-
隶属关系:
- National Research University “MPÉI”
- 期: 卷 50, 编号 3 (2016)
- 页面: 235-239
- 栏目: Hydrotechnical Construction
- URL: https://journal-vniispk.ru/1570-145X/article/view/245184
- DOI: https://doi.org/10.1007/s10749-016-0689-4
- ID: 245184
如何引用文章
详细
The capability is studied of improving the investment potential of the Evenkiiskaya HPP by using the power it generates in the United Power System of the European part of Russia by transitioning to a compensated electrical regime of water reservoir resource usage. A quantitative assessment of Evenkiiskaya HPP usage is presented using daily load demand. Increasing the guaranteed HPP power is proposed as an alternative to new nuclear power stations.
作者简介
A. Aleksandrovskii
National Research University “MPÉI”
编辑信件的主要联系方式.
Email: ayaleksand@mail.ru
俄罗斯联邦, Moscow
A. Soldatkin
National Research University “MPÉI”
Email: ayaleksand@mail.ru
俄罗斯联邦, Moscow
D. Volkov
National Research University “MPÉI”
Email: ayaleksand@mail.ru
俄罗斯联邦, Moscow
补充文件
