Hydraulic Studies in Support of the Construction of a Stepped Spillway at The Boguchany Hydroelectric Power Plant
- Authors: Sudol’skii G.A.1
-
Affiliations:
- B. E. Vedeneev All-Russia Research Institute of Hydraulic Engineering (VNIIG)
- Issue: Vol 50, No 5 (2017)
- Pages: 487-495
- Section: Article
- URL: https://journal-vniispk.ru/1570-145X/article/view/245396
- DOI: https://doi.org/10.1007/s10749-017-0737-8
- ID: 245396
Cite item
Abstract
Hydraulic studies are made in support of the construction of a stepped spillway at the Boguchany Hydroelectric Power Plant with a height of 81.5 m and a step height of 1.5 m designed for a specific discharge rate of up to 45 m2/sec. The flow and energy loss parameters and the hydrodynamic effect of the flow on a step are determined. These discharge flows are realized in full-scale test.
About the authors
G. A. Sudol’skii
B. E. Vedeneev All-Russia Research Institute of Hydraulic Engineering (VNIIG)
Author for correspondence.
Email: SudolskyGA@vniig.ru
Russian Federation, St. Petersburg
Supplementary files