Some Specifications of the PGU-800 Combined-Cycle Power Unit of the Perm TPP


Cite item

Full Text

Open Access Open Access
Restricted Access Access granted
Restricted Access Subscription Access

Abstract

The paper presents the main specificatons of the Perm TPP and its main equipment, as well as their change resulting from the commissioning of PGU-800 power unit 4 after start-up and warranty tests at the PGU-800 start-up facility and comprehensive testing and power certification of the unit. The scope and procedure of construction, installation, and setup and adjustment and the results of the tests carried out after their completion are described. The tests demonstrated the main technical, economic, and environmental characteristics of the unit and main equipment, operational flexibility, startup duration, operating range, load change rate in this range.

About the authors

A. E. Taganov

JSC Integrated Energy Solutions

Email: vti@vti.ru
Russian Federation, Moscow

M. V. Zaleshin

JSC Integrated Energy Solutions

Email: vti@vti.ru
Russian Federation, Moscow

Yu. A. Radin

All-Russia Thermal Engineering Institute

Author for correspondence.
Email: vti@vti.ru
Russian Federation, Moscow

I. A. Grishin

JSC Integrated Energy Solutions

Email: vti@vti.ru
Russian Federation, Moscow

Supplementary files

Supplementary Files
Action
1. JATS XML

Copyright (c) 2019 Springer Science+Business Media, LLC, part of Springer Nature