Experience of Designing and Constructing the Lower Bureya Earth-Fill Dam with an Impervious Diaphragm Made from Secant Bored Piles
- Авторлар: Borzunov V.V.1, Denisov G.V.1, Kadushkina E.A.1, Nikolaeva E.A.1, Fedorov A.V.1
-
Мекемелер:
- JSC “Lengidroproekt,” St. Petersburg
- Шығарылым: Том 53, № 4 (2019)
- Беттер: 420-428
- Бөлім: Article
- URL: https://journal-vniispk.ru/1570-145X/article/view/246540
- DOI: https://doi.org/10.1007/s10749-019-01094-w
- ID: 246540
Дәйексөз келтіру
Аннотация
The design experience and construction stages of the Lower Bureya earth-fill run-of-river dam with an impervious diaphragm (“wall in trench”) made from secant bored piles are described. Recommendations for subsequent projects are formulated.
Авторлар туралы
V. Borzunov
JSC “Lengidroproekt,” St. Petersburg
Хат алмасуға жауапты Автор.
Email: office@lhp.ru
Ресей, Moscow
G. Denisov
JSC “Lengidroproekt,” St. Petersburg
Email: office@lhp.ru
Ресей, Moscow
E. Kadushkina
JSC “Lengidroproekt,” St. Petersburg
Email: office@lhp.ru
Ресей, Moscow
E. Nikolaeva
JSC “Lengidroproekt,” St. Petersburg
Email: office@lhp.ru
Ресей, Moscow
A. Fedorov
JSC “Lengidroproekt,” St. Petersburg
Email: office@lhp.ru
Ресей, Moscow
Қосымша файлдар
