Experience of Designing and Constructing the Lower Bureya Earth-Fill Dam with an Impervious Diaphragm Made from Secant Bored Piles
- 作者: Borzunov V.V.1, Denisov G.V.1, Kadushkina E.A.1, Nikolaeva E.A.1, Fedorov A.V.1
-
隶属关系:
- JSC “Lengidroproekt,” St. Petersburg
- 期: 卷 53, 编号 4 (2019)
- 页面: 420-428
- 栏目: Article
- URL: https://journal-vniispk.ru/1570-145X/article/view/246540
- DOI: https://doi.org/10.1007/s10749-019-01094-w
- ID: 246540
如何引用文章
详细
The design experience and construction stages of the Lower Bureya earth-fill run-of-river dam with an impervious diaphragm (“wall in trench”) made from secant bored piles are described. Recommendations for subsequent projects are formulated.
作者简介
V. Borzunov
JSC “Lengidroproekt,” St. Petersburg
编辑信件的主要联系方式.
Email: office@lhp.ru
俄罗斯联邦, Moscow
G. Denisov
JSC “Lengidroproekt,” St. Petersburg
Email: office@lhp.ru
俄罗斯联邦, Moscow
E. Kadushkina
JSC “Lengidroproekt,” St. Petersburg
Email: office@lhp.ru
俄罗斯联邦, Moscow
E. Nikolaeva
JSC “Lengidroproekt,” St. Petersburg
Email: office@lhp.ru
俄罗斯联邦, Moscow
A. Fedorov
JSC “Lengidroproekt,” St. Petersburg
Email: office@lhp.ru
俄罗斯联邦, Moscow
补充文件
