New Amine Water Treatment at the VAZ TPP


Citar

Texto integral

Acesso aberto Acesso aberto
Acesso é fechado Acesso está concedido
Acesso é fechado Somente assinantes

Resumo

The technical and economical aspects of the operation of the heat-exchange equipment at the VAZ TPP with conventional hydrazine and new amine water treatment programs are discussed. The water treatment programs are compared against the corrosion rate in various sections of the water/steam circuit and deposition rate. The annual cost advantage is calculated based on data on the consumption of fuel, electricity, water, and chemicals. Using the economic and environmentally sound amine water treatment programs will ensure stable operation of the heat energy system of the plant and safe working conditions.

Sobre autores

A. Gridchin

TEC-Group LLC

Autor responsável pela correspondência
Email: info@teh-g.ru
Rússia, Tolyatti, Samara oblast’

O. Mozharenko

TEC-Group LLC

Email: info@teh-g.ru
Rússia, Tolyatti, Samara oblast’

A. Popov

VAZ TPP of Samarsky branch of T Plus PJSC

Email: info@teh-g.ru
Rússia, Tolyatti, Samara oblast’

Arquivos suplementares

Arquivos suplementares
Ação
1. JATS XML

Declaração de direitos autorais © Springer Science+Business Media New York, 2016