New Amine Water Treatment at the VAZ TPP


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

The technical and economical aspects of the operation of the heat-exchange equipment at the VAZ TPP with conventional hydrazine and new amine water treatment programs are discussed. The water treatment programs are compared against the corrosion rate in various sections of the water/steam circuit and deposition rate. The annual cost advantage is calculated based on data on the consumption of fuel, electricity, water, and chemicals. Using the economic and environmentally sound amine water treatment programs will ensure stable operation of the heat energy system of the plant and safe working conditions.

作者简介

A. Gridchin

TEC-Group LLC

编辑信件的主要联系方式.
Email: info@teh-g.ru
俄罗斯联邦, Tolyatti, Samara oblast’

O. Mozharenko

TEC-Group LLC

Email: info@teh-g.ru
俄罗斯联邦, Tolyatti, Samara oblast’

A. Popov

VAZ TPP of Samarsky branch of T Plus PJSC

Email: info@teh-g.ru
俄罗斯联邦, Tolyatti, Samara oblast’

补充文件

附件文件
动作
1. JATS XML

版权所有 © Springer Science+Business Media New York, 2016