State of Concrete Dam of the Krasnoyarsk Hydropower Station After 50 Years of Operation
- Autores: Denisov V.I.1, Latyshev V.I.2, Kuz’min N.G.3
-
Afiliações:
- Director of Management for Basic Production (Chief Engineer), Krasnoyarsk Hydropower Station
- Deputy Director of Management for Basic Production (Maintenance), Krasnoyarsk Hydropower Station
- Head of Dam Surveillance Section of Hydraulic Engineering Department, Krasnoyarsk Hydropower Station
- Edição: Volume 51, Nº 6 (2018)
- Páginas: 628-638
- Seção: Article
- URL: https://journal-vniispk.ru/1570-145X/article/view/245992
- DOI: https://doi.org/10.1007/s10749-018-0883-7
- ID: 245992
Citar
Resumo
Problems related to the state of the concrete dam of the Krasnoyarsk Hydropower Station are considered. Results of field observations of the state of the dam are presented. The composition of the control and measurement instrumentation and characteristics of the concrete in the dam are presented.
Sobre autores
V. Denisov
Director of Management for Basic Production (Chief Engineer), Krasnoyarsk Hydropower Station
Autor responsável pela correspondência
Email: denisov@kges.ru
Rússia, Krasnoyarsk
V. Latyshev
Deputy Director of Management for Basic Production (Maintenance), Krasnoyarsk Hydropower Station
Email: denisov@kges.ru
Rússia, Krasnoyarsk
N. Kuz’min
Head of Dam Surveillance Section of Hydraulic Engineering Department, Krasnoyarsk Hydropower Station
Email: denisov@kges.ru
Rússia, Krasnoyarsk
Arquivos suplementares
