State of Concrete Dam of the Krasnoyarsk Hydropower Station After 50 Years of Operation
- Авторлар: Denisov V.I.1, Latyshev V.I.2, Kuz’min N.G.3
-
Мекемелер:
- Director of Management for Basic Production (Chief Engineer), Krasnoyarsk Hydropower Station
- Deputy Director of Management for Basic Production (Maintenance), Krasnoyarsk Hydropower Station
- Head of Dam Surveillance Section of Hydraulic Engineering Department, Krasnoyarsk Hydropower Station
- Шығарылым: Том 51, № 6 (2018)
- Беттер: 628-638
- Бөлім: Article
- URL: https://journal-vniispk.ru/1570-145X/article/view/245992
- DOI: https://doi.org/10.1007/s10749-018-0883-7
- ID: 245992
Дәйексөз келтіру
Аннотация
Problems related to the state of the concrete dam of the Krasnoyarsk Hydropower Station are considered. Results of field observations of the state of the dam are presented. The composition of the control and measurement instrumentation and characteristics of the concrete in the dam are presented.
Авторлар туралы
V. Denisov
Director of Management for Basic Production (Chief Engineer), Krasnoyarsk Hydropower Station
Хат алмасуға жауапты Автор.
Email: denisov@kges.ru
Ресей, Krasnoyarsk
V. Latyshev
Deputy Director of Management for Basic Production (Maintenance), Krasnoyarsk Hydropower Station
Email: denisov@kges.ru
Ресей, Krasnoyarsk
N. Kuz’min
Head of Dam Surveillance Section of Hydraulic Engineering Department, Krasnoyarsk Hydropower Station
Email: denisov@kges.ru
Ресей, Krasnoyarsk
Қосымша файлдар
