Commissioning of the PGU-220 Steam-Gas Power Generating Unit at the TÉTS-12 Thermal Power Plant of PJSC “Mosenergo”


Дәйексөз келтіру

Толық мәтін

Ашық рұқсат Ашық рұқсат
Рұқсат жабық Рұқсат берілді
Рұқсат жабық Тек жазылушылар үшін

Аннотация

From September 1, 2013, through May 31, 2015, startup-adjustment work and equipment tests for the startup system for the PGU-220 steam-gas power unit at the TÉTs-12 thermal power plant of PJSC “Mosenergo” were carried out under the leadership of the general contractor JSC “TÉK Mosenergo,” JSC “VTI,” (setup and testing of thermal and mechanical equipment) with the participation of JSC “Firma ORGRÉS” (post-installation cleaning of the boiler-utilizer and adjustment of the water-chemical treatment regime). The basic results of this commissioning activity and test startup of the power generating unit are presented.

Авторлар туралы

Yu. Radin

JSC “All-Russia Thermal Engineering Institute” (VTI)

Хат алмасуға жауапты Автор.
Email: vti@vti.ru
Ресей, Moscow

S. Rumyantsev

PJSC “Mosenergo”

Email: vti@vti.ru
Ресей, Moscow

V. Smyshlyaev

JSC “All-Russia Thermal Engineering Institute” (VTI)

Email: vti@vti.ru
Ресей, Moscow

D. Gorlatov

CHP-12 (TÉTs-12)—branch of PJSC “Mosenergo”

Email: vti@vti.ru
Ресей, Moscow

I. Grishin

JSC “All-Russia Thermal Engineering Institute” (VTI)

Email: vti@vti.ru
Ресей, Moscow

Қосымша файлдар

Қосымша файлдар
Әрекет
1. JATS XML

© Springer Science+Business Media New York, 2016