Use of TCSR with Split Windings for Shortening the Spar Cycle Time in 500 kV Lines
- 作者: Matinyan A.M.1, Peshkov M.V.1, Karpov V.N.1, Alekseev N.A.1
-
隶属关系:
- JSC “R&D Center at Federal Grid Company of Unified Power System,”
- 期: 卷 50, 编号 5 (2017)
- 页面: 560-566
- 栏目: Article
- URL: https://journal-vniispk.ru/1570-145X/article/view/245459
- DOI: https://doi.org/10.1007/s10749-017-0751-x
- ID: 245459
如何引用文章
详细
The arc-fault recharge phenomenon in single-phase automatic reclosure (SPAR) of a line is examined. Abrief description is given of the design of a 500 kV thyristor controlled shunt reactor (TCSR) with split valve-side windings. This type of TCSR is shown to effectively quench a single-phase arc fault in a power transmission line and shortens the SPAR cycle time.
作者简介
A. Matinyan
JSC “R&D Center at Federal Grid Company of Unified Power System,”
编辑信件的主要联系方式.
Email: al-drm@mail.ru
俄罗斯联邦, Moscow
M. Peshkov
JSC “R&D Center at Federal Grid Company of Unified Power System,”
Email: al-drm@mail.ru
俄罗斯联邦, Moscow
V. Karpov
JSC “R&D Center at Federal Grid Company of Unified Power System,”
Email: al-drm@mail.ru
俄罗斯联邦, Moscow
N. Alekseev
JSC “R&D Center at Federal Grid Company of Unified Power System,”
Email: al-drm@mail.ru
俄罗斯联邦, Moscow
补充文件
