Use of TCSR with Split Windings for Shortening the Spar Cycle Time in 500 kV Lines


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

The arc-fault recharge phenomenon in single-phase automatic reclosure (SPAR) of a line is examined. Abrief description is given of the design of a 500 kV thyristor controlled shunt reactor (TCSR) with split valve-side windings. This type of TCSR is shown to effectively quench a single-phase arc fault in a power transmission line and shortens the SPAR cycle time.

作者简介

A. Matinyan

JSC “R&D Center at Federal Grid Company of Unified Power System,”

编辑信件的主要联系方式.
Email: al-drm@mail.ru
俄罗斯联邦, Moscow

M. Peshkov

JSC “R&D Center at Federal Grid Company of Unified Power System,”

Email: al-drm@mail.ru
俄罗斯联邦, Moscow

V. Karpov

JSC “R&D Center at Federal Grid Company of Unified Power System,”

Email: al-drm@mail.ru
俄罗斯联邦, Moscow

N. Alekseev

JSC “R&D Center at Federal Grid Company of Unified Power System,”

Email: al-drm@mail.ru
俄罗斯联邦, Moscow

补充文件

附件文件
动作
1. JATS XML

版权所有 © Springer Science+Business Media New York, 2017