Construction of the Zaramag HPPs in 2009 to 2012
- 作者: Kasatkin N.V.1, Konikh G.S.1, Loginova M.A.1, Lishankov I.V.1
-
隶属关系:
- JSC “Lenhydroproject”
- 期: 卷 52, 编号 1 (2018)
- 页面: 1-4
- 栏目: Hydrotechnical Construction
- URL: https://journal-vniispk.ru/1570-145X/article/view/246061
- DOI: https://doi.org/10.1007/s10749-018-0901-9
- ID: 246061
如何引用文章
详细
Abnormal/beyond-design situations during the construction of the Zaramag HPPs in 2009 to 2012 and engineering solutions that helped to overcome them are described.
作者简介
N. Kasatkin
JSC “Lenhydroproject”
编辑信件的主要联系方式.
Email: KasatkinNV@lhp.ru
俄罗斯联邦, St. Petersburg
G. Konikh
JSC “Lenhydroproject”
Email: KasatkinNV@lhp.ru
俄罗斯联邦, St. Petersburg
M. Loginova
JSC “Lenhydroproject”
Email: KasatkinNV@lhp.ru
俄罗斯联邦, St. Petersburg
I. Lishankov
JSC “Lenhydroproject”
Email: KasatkinNV@lhp.ru
俄罗斯联邦, St. Petersburg
补充文件
