Modernization of the Irkutsk Refrigeration Plant

Cover Page

Cite item

Full Text

Abstract

The Irkutsk Cold Storage Plant was put into operation in 1958. (the ice cream factory went into operation in 1960), has a total conditional capacity of 19645 tons, including the capacity of negative temperature chambers of 11739 tons. The ice-cream factory performs operations of acceptance, storage and shipment of goods, rents out refrigerated chambers, and produces ice cream. The refrigeration plant was reconstructed between 1993 and 1996, but was not completed. In 2002 with the coming of the new owner reconstruction and modernization of the ammonia refrigerating plant (ACP) according to the project of Odessa Institute of Low Temperature Equipment and Energy (1995) was resumed.

About the authors

I. G. Machkov

OOO Irkutsk Refrigeration Plant

Author for correspondence.
Email: info@eco-vector.com

Chief Engineer

Russian Federation

References

Supplementary files

Supplementary Files
Action
1. JATS XML
2. I.G. Machkov, Chief Engineer, OOO Irkutsk Refrigeration Plant

Download (607KB)
3. Photo

Download (2MB)
4. Fig. 1. Purger air separator

Download (1MB)
5. Fig. 2. Compressor 21A 110-7-0

Download (2MB)
6. Fig. 3. Cooling towers "Rosinka-80/100"

Download (851KB)
7. Fig. 4. F2MS3-2500 compressor unit

Download (2MB)

Copyright (c) 2003 Machkov I.G.

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

Согласие на обработку персональных данных

 

Используя сайт https://journals.rcsi.science, я (далее – «Пользователь» или «Субъект персональных данных») даю согласие на обработку персональных данных на этом сайте (текст Согласия) и на обработку персональных данных с помощью сервиса «Яндекс.Метрика» (текст Согласия).