Local Erosion of the Channel After Reinforcement of the Millrace of the Votkinsk Hydroelectric Power Plant
- 作者: Veksler A.B.1, Fisenko V.F.2
-
隶属关系:
- JSC “VNIIG im. B. E. Vedeneeva”
- Votkinsk HPP, branch of JSC RusHydro
- 期: 卷 51, 编号 1 (2017)
- 页面: 14-19
- 栏目: Article
- URL: https://journal-vniispk.ru/1570-145X/article/view/245558
- DOI: https://doi.org/10.1007/s10749-017-0775-2
- ID: 245558
如何引用文章
详细
Changes during operation in the state of the segment where concrete reinforcement of the water channels of the Votkinsk hydroelectric plant join the Kama River are examined. The reasons for erosion during the 1990’s, including lowering of the water levels in the lower millrace, are examined. It is noted that after reinforcement of the hopper during 1998 – 2000, the state of this segment remains satisfactory and does not threaten the safety of the equipment.
作者简介
A. Veksler
JSC “VNIIG im. B. E. Vedeneeva”
编辑信件的主要联系方式.
Email: VekslerAB@vniig.ru
俄罗斯联邦, St. Petersburg
V. Fisenko
Votkinsk HPP, branch of JSC RusHydro
Email: VekslerAB@vniig.ru
俄罗斯联邦, Votkinsk
补充文件
