| 期 |
标题 |
文件 |
| 卷 53, 编号 1 (2019) |
Assessment of the Time a Power System Remains in the Power Deficit Zone as a Function of the Scale Factor for Wind-Power Plants |
|
|
Fedorov E., Shcheklein S., Akif’eva N.
|
| 卷 52, 编号 2 (2018) |
Assigning the Packing Density of Skeletal Clay Soil in the Dam Core |
|
|
Rasskazov L., Zagidulina A., Yadgorov E.
|
| 卷 51, 编号 5 (2018) |
Automated Calculation and Coordination of Protective Relay Settings |
|
|
Kulikov A., Sharygin M.
|
| 卷 50, 编号 3 (2016) |
Automated System of Diagnostic Monitoring at Bureya HPP Hydraulic Engineering Installations: a New Level of Safety |
|
|
Musyurka A.
|
| 卷 49, 编号 6 (2016) |
Automatic Process Controller for the Adler Thermal Electric Power Plant |
|
|
Talamanov S., Abramov A., Salenko A., Popov M., Zhuravskii D., Tverdovskii N.
|
| 卷 52, 编号 6 (2019) |
Barring of Turbine-Driven Feed Pumps at TPPS |
|
|
Vasil’ev V., Sirotkin V., Erpalov A.
|
| 卷 52, 编号 5 (2019) |
BASF Technology for Repairing Navigational Hydraulic Structures of the White Sea-Baltic Canal |
|
|
Leont’ev A., Vasil’eva A.
|
| 卷 51, 编号 1 (2017) |
Basic Stages in the Introduction of Systems of Continuous Monitoring and Measurement of Discharges Into the Atmosphere From Thermal Electric Power Stations |
|
|
Kondrat’eva O., Roslyakov P.
|
| 卷 50, 编号 1 (2016) |
Behavior of the Concrete and Rock-Fill Dam at the Boguchanskaya HPP During the Period of Reservoir Filling (2012 – 2015) |
|
|
Volynchikov A., Gaziev É.
|
| 卷 50, 编号 2 (2016) |
Building and Structure Protection and Leveling Using Compensation Grouting Technology |
|
|
Bellendir E., Aleksandrov A., Zertsalov M., Simutin A.
|
| 卷 52, 编号 4 (2018) |
Calcuation of Coastal Protection Structures |
|
|
Petrov V.
|
| 卷 52, 编号 5 (2019) |
Calculated Substantiation of Controlled Compensation Grouting for Lifting the Foundation Slab of Zagorsk PSP-2 |
|
|
Zertsalov M., Simutin A., Aleksandrov A.
|
| 卷 50, 编号 6 (2017) |
Calculating Currents in Lightning Protection Cables and in Optical Cables Built Into Them During Asymmetric Short Circuits In Overhead Transmission Lines |
|
|
Sharipov U., Égamnazarov G.
|
| 卷 53, 编号 4 (2019) |
Calculating the Crack Resistance of Fiber-Reinforced Concrete Lining of Free-Flow Water Tunnels Using Linear Fracture Mechanics |
|
|
Zertsalov M., Khoteev E.
|
| 卷 52, 编号 1 (2018) |
Calculating the Starting Currents of Electric Motors in 0.4 kV Auxiliary Networks of Nuclear Power Plants |
|
|
Aroyan S.
|
| 卷 51, 编号 4 (2017) |
Calculation Methodology for Defining the Filtration Coefficient of a Rock Mass with Loose Crack Filler |
|
|
Chernyshev S., Zommer T., Lavrusevich A.
|
| 卷 51, 编号 3 (2017) |
Calculation of Admissible Currents for the Protected Wires of 110 kV Overhead Lines |
|
|
Vikharev A.
|
| 卷 51, 编号 5 (2018) |
Calculation of Filtration in Earth-Fill Dams with Impervious Diaphragms |
|
|
Anakhaev K., Aniskin N., Amshokov B., Anakhaeva K.
|
| 卷 53, 编号 2 (2019) |
Calculation of Heat Transfer from the Surface of Uninsulated Conductors of New Generation |
|
|
Shakirov R., Fedorov N.
|
| 卷 52, 编号 2 (2018) |
Calculation of Horizontal Pressure of Backfill on a Round Wall |
|
|
Rashchepkina S.
|
| 卷 51, 编号 2 (2017) |
Calculation of Offshore Ice-Resistant Structures Under Action of Ice Loads in Light of Russian Structure Standards |
|
|
Polit’ko V., Kantarzhi I.
|
| 卷 52, 编号 4 (2018) |
Calculation of Permissible Power of Synchronous Generators Functioning with Transformer Load |
|
|
Tul’skii V., Dzhuraev S., Inoyatov B.
|
| 卷 52, 编号 3 (2018) |
Calculation of the Admissible Short Circuit Current for the Protected Wires of an OHL |
|
|
Vikharev A.
|
| 卷 53, 编号 4 (2019) |
Calculation of the Flow Depth on a Ledge at the Channel End |
|
|
Loktionova E., Miftakhova D.
|
| 卷 52, 编号 5 (2019) |
Calculation of the Thermal Regime of Gas-Insulated Electrical Transmission Lines |
|
|
Vikharev A.
|
| 51 - 75 的 486 信息 |
<< < 1 2 3 4 5 6 7 8 9 10 > >> |