Increasing the Reliability of Steam-Jet Ejectors in Power Plant Turbines1


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

Steps to increase the reliability of steam-jet ejectors are proposed based on the authors’ experience with the development and modernization of more than 80 systems. Statistical data on ejector failures and recovery times are analyzed. It is shown that, in most cases, ejector failure leads to shutdown of the turbine system. The list of the identified defects is provided.

作者简介

A. Ryabchikov

The first President of Russia B. N. Yeltsin Urals Federal University

编辑信件的主要联系方式.
Email: lta_ugtu@mail.ru
俄罗斯联邦, Yekaterinburg

K. Aronson

The first President of Russia B. N. Yeltsin Urals Federal University

Email: lta_ugtu@mail.ru
俄罗斯联邦, Yekaterinburg

Yu. Brodov

The first President of Russia B. N. Yeltsin Urals Federal University

Email: lta_ugtu@mail.ru
俄罗斯联邦, Yekaterinburg

B. Murmanskii

JSC “ITs Uraltekhenergo,”

Email: lta_ugtu@mail.ru
俄罗斯联邦, Yekaterinburg

I. Murmanskii

The first President of Russia B. N. Yeltsin Urals Federal University

Email: lta_ugtu@mail.ru
俄罗斯联邦, Yekaterinburg

N. Zhelonkin

The first President of Russia B. N. Yeltsin Urals Federal University

Email: lta_ugtu@mail.ru
俄罗斯联邦, Yekaterinburg

S. Khaet

The first President of Russia B. N. Yeltsin Urals Federal University

Email: lta_ugtu@mail.ru
俄罗斯联邦, Yekaterinburg

补充文件

附件文件
动作
1. JATS XML

版权所有 © Springer Science+Business Media New York, 2017